Sunday, November 16, 2008

slinging lead

3 hours with my missy
A good Sunday shop day.  We spent a solid three hours getting the left elevator ready for riveting and then headed to watch some football.

next up... trim tab!

drilling out lead is interesting... it really slings the drillings all over the place.  here i am removing material from the counterbalance weight in the left elevator
a band saw would be much better cutting lead...
getting the left elevator ready for riveting