I finished up the bulk of the prep on the left wing and set up the wing stand for the right wing. Getting the ribs ready for priming is quite a chore... I hope to get the right wing to match the left tomorrow.
Back on the bench I final drilled the wing getting ready to rivet. I need a larger step drill to cut holes for the conduit that will feed to the wingtip and finalize the pitot and AOA lines.
![]() |
| building both wings at the same time |
![]() |
| blocking midspan to level the wing in the stand |
![]() |
| sighting down lightening holes in the wing |
![]() |
| squaring up a wing flange with hand seamers |
![]() |
| nearing the end of the pile of ribs! |
![]() |
| drilling the rib to trailing spar attachments worked out fine on the bench |
![]() |
| more ribs please! |






